BIM Glossary / BIM coordination software

BIM coordination software

What is BIM Coordination Software?

BIM coordination software provides a dedicated environment for multidisciplinary teams – architects, structural engineers, MEP engineers, and other specialists – to integrate their individual BIM models into a federated model. This allows for comprehensive analysis, enabling the detection of spatial clashes (e.g., a pipe running through a structural beam) and logical conflicts. By identifying and resolving these issues in the digital realm, project teams can significantly reduce costly rework, delays, and disputes that often arise during the physical construction phase.

While similar in function to broader construction collaboration software, BIM coordination software offers a more specialized focus on the intricacies of model-based workflows. It emphasizes clash detection, model-centric issue management, and direct integration with BIM authoring tools – key components not always as deeply embedded in more general collaboration platforms.

A fundamental concept underpinning effective BIM coordination software is the Common Data Environment (CDE). A CDE acts as a single source of truth for all project information, ensuring that every team member, regardless of their discipline or location, is accessing the most current and accurate data. This eliminates version control issues, reduces miscommunication, and significantly improves decision-making, particularly in complex BIM environments.

Key Features of BIM Coordination Software

Modern BIM coordination software is characterized by a suite of features designed to address the unique demands of model-based coordination:

  • Model Aggregation and Federation: The ability to combine individual BIM models from different disciplines (e.g., architectural, structural, MEP) into a single, comprehensive federated model for holistic review.
  • Automated Clash Detection: Tools to automatically identify spatial, clearance, and logical clashes between model elements. Advanced software allows for customizable clash rules and filtering to prioritize critical issues.
  • Model Viewing and Markup: Robust capabilities for viewing 2D drawings and 3D BIM models, with intuitive tools for commenting, annotating, and redlining directly on the models. This is crucial for clear communication of identified issues.
  • Integrated Issue Management: A system to create, track, assign, and manage clashes and other coordination issues. This includes setting priorities, deadlines, and tracking resolution status, ensuring accountability.
  • Version Control and Audit Trails: Meticulous tracking of all model versions and changes, along with comprehensive audit trails of who made what changes and when. This ensures data integrity and traceability throughout the project lifecycle.
  • Workflow Automation: Tools to automate routine coordination tasks such as RFI (Request for Information) processes, submittal reviews, and clash reporting, streamlining the coordination cycle.
  • Open Standards Support: Compatibility with open BIM formats like IFC (Industry Foundation Classes), BCF (BIM Collaboration Format) and IDS (Information Delivery Specifications). This is critical for interoperability between different software applications and promotes vendor neutrality.
  • Reporting and Analytics: The ability to generate detailed reports on clash statistics, issue resolution rates, and overall coordination progress, providing valuable insights for project stakeholders.
  • Mobile Accessibility: Ensuring that project information, including models and issue logs, is accessible from any device, crucial for site management and field teams to verify coordination efforts on-site.
  • Integrations: Seamless compatibility with BIM authoring tools (e.g., Revit, ArchiCAD, Tekla Structures) and other construction project document management software to create a connected ecosystem.

The Benefits of Embracing BIM Coordination Software

Implementing BIM coordination software yields significant benefits, particularly for project quality and efficiency:

  • Reduced Rework and Cost Overruns: By identifying and resolving clashes digitally before construction, teams avoid costly on-site conflicts, material waste, and schedule delays. This directly impacts the project’s bottom line.
  • Improved Design Quality: Early coordination ensures designs are constructible and functional, leading to a higher quality final product and fewer post-construction issues.
  • Enhanced Communication and Collaboration: The platform serves as a central hub for all coordination-related discussions, fostering a more transparent and responsive environment among all disciplines involved in BIM collaboration.
  • Accelerated Project Schedules: Efficient clash resolution and streamlined workflows contribute to faster decision-making and a more predictable construction timeline.
  • Better Risk Management: Proactive identification of potential issues reduces project risks, leading to safer construction practices and more secure project outcomes.
  • Increased Data Accuracy and Reliability: The CDE concept ensures that all project participants are working with the most up-to-date and accurate model information, leading to higher quality deliverables.
  • Greater Accountability: With clear assignment of issues, tracking of resolution progress, and documented communication, individual and team accountability for coordination efforts is significantly improved.

Criteria for Choosing BIM Coordination Software

When evaluating BIM coordination software solutions, consider the following criteria:

CriteriaDescription
Open Standards SupportCompatibility with open BIM formats (e.g., IFC, BCF, IDS) is critical for interoperability.
Automated Clash DetectionRobust and customizable clash detection capabilities with intelligent reporting.
Integrated Issue TrackingComprehensive system for creating, assigning, tracking, and resolving coordination issues.
Real-time SynchronizationEnables live updates and true collaboration on models and issues.
ScalabilityShould support large, complex projects with many stakeholders and extensive model data.
Ease of UseIntuitive interface for various users, from BIM specialists to project managers.
Mobile AccessEssential for on-site validation and issue reporting from the field for site management.
Customizable WorkflowsAbility to tailor coordination processes to your project’s specific methodology.
Cloud Hosting & SecurityEnsure compliance with data privacy and security standards for your project data.
Collaboration AnalyticsInsight into coordination performance, issue resolution rates, and team efficiency.

What are the popular BIM Coordination Software used for BIM Coordination?

The evolution of Building Information Modeling (BIM) has led to a robust ecosystem of software designed to support every stage of a construction project. These tools facilitate a collaborative and data-rich environment, moving beyond simple 3D modeling to address critical project functions. Here is a breakdown of key software categories used in BIM coordination, each serving a distinct purpose in ensuring project success.

Clash Detection and Model Coordination

These applications are foundational to BIM coordination, as they identify and resolve conflicts between different building elements (e.g., architectural, structural, and MEP systems) before construction begins. The goal is to prevent costly on-site errors and rework.

  • Autodesk Navisworks Manage: An industry benchmark for aggregating models from various sources, this software provides powerful clash detection and 4D simulation (time sequencing).
  • Solibri Office: Highly regarded for its rule-based clash and model checking capabilities, it is particularly effective in openBIM workflows using the IFC format.

Rule-Based Model Checking (Quality Assurance & Validation)

Beyond simple clash detection, these tools perform automated checks to ensure a model complies with a project’s specific standards, building codes, and BIM execution plan. This proactive validation ensures data quality and adherence to project requirements.

  • Solibri Office: In addition to clash detection, it validates models against a wide range of rules, including fire safety, accessibility, and geometric accuracy.
  • dRofus: A powerful database-driven tool used for data validation, it ensures that models meet the functional and technical requirements of a project brief, particularly for space and equipment planning.
  • Simplebim: This software specializes in cleaning and standardizing IFC models, making them more reliable and efficient for downstream uses.

Issue Tracking and Coordination (BCF-Based Workflows)

Effective collaboration hinges on clear communication. These platforms use the open BIM Collaboration Format (BCF) to create, track, and manage issues within a model, ensuring every problem is assigned, monitored, and resolved.

  • Catenda Hub: A cloud-based BIM coordination software, was built to support open standards and empower every stakeholder in the construction lifecycle. Unlike legacy tools, Catenda Hub provides:
    • Full BIM collaboration capabilities with a focus on open formats.
    • A modern UI with no need for plugins, simplifying access and use.
    • Robust support for site management features, bridging the gap between design and construction.
    • Real-time issue tracking and advanced model viewing for efficient coordination.
    • Built-in construction document management alongside model coordination.
    • Integrating with various common coordination tools like Naviswork, Solibri, Simplebim etc.

Catenda Hub helps project teams work more transparently and efficiently—whether you’re coordinating design changes, managing RFIs, or tracking site progress. By centralizing models and issues in a Common Data Environment, it ensures clarity, control, and confidence from design through delivery, making it an indispensable tool for proactive BIM Managers.

Construction Sequencing (4D/5D BIM Coordination)

These advanced applications link the 3D model with the project schedule (4D) and cost data (5D). This integration enables teams to visualize the construction process, identify logistical challenges, and optimize resource allocation before work begins.

  • Navisworks Manage: Its 4D simulation features allow teams to create time-lapse videos of the construction sequence to identify potential schedule conflicts.
  • Synchro 4D: An advanced planning solution that allows for detailed 4D construction sequencing, optimizing logistics and project execution.
  • Vico Office: This software integrates 5D BIM by linking the model to both the project schedule and cost estimates, providing a comprehensive view of project performance.

Field Coordination and On-Site BIM

This category of software extends the power of BIM to the job site. Field teams can access and interact with coordinated models on mobile devices, enabling real-time issue reporting and progress tracking.

  • Catenda Site: Mobile app linked to Catenda Hub for offline 2D/3D model viewing, geolocated issue tracking, and syncing field updates in IFC/BCF workflows
  • PlanGrid (Autodesk Build): Part of a larger construction management suite, it integrates model coordination with on-site workflows, linking field tasks to the central BIM model.