BIM Glossary / BIM coordination software

BIM coordination software

What is BIM Coordination Software?

BIM coordination software provides a dedicated environment for multidisciplinary teams – architects, structural engineers, MEP engineers, and other specialists – to integrate their individual BIM models into a federated model. This allows for comprehensive analysis, enabling the detection of spatial clashes (e.g., a pipe running through a structural beam) and logical conflicts. By identifying and resolving these issues in the digital realm, project teams can significantly reduce costly rework, delays, and disputes that often arise during the physical construction phase.

While similar in function to broader construction collaboration software, BIM coordination software offers a more specialized focus on the intricacies of model-based workflows. It emphasizes clash detection, model-centric issue management, and direct integration with BIM authoring tools – key components not always as deeply embedded in more general collaboration platforms.

A fundamental concept underpinning effective BIM coordination software is the Common Data Environment (CDE). A CDE acts as a single source of truth for all project information, ensuring that every team member, regardless of their discipline or location, is accessing the most current and accurate data. This eliminates version control issues, reduces miscommunication, and significantly improves decision-making, particularly in complex BIM environments.

Key Features of BIM Coordination Software

Modern BIM coordination software is characterized by a suite of features designed to address the unique demands of model-based coordination:

  • Model Aggregation and Federation: The ability to combine individual BIM models from different disciplines (e.g., architectural, structural, MEP) into a single, comprehensive federated model for holistic review.
  • Automated Clash Detection: Tools to automatically identify spatial, clearance, and logical clashes between model elements. Advanced software allows for customizable clash rules and filtering to prioritize critical issues.
  • Model Viewing and Markup: Robust capabilities for viewing 2D drawings and 3D BIM models, with intuitive tools for commenting, annotating, and redlining directly on the models. This is crucial for clear communication of identified issues.
  • Integrated Issue Management: A system to create, track, assign, and manage clashes and other coordination issues. This includes setting priorities, deadlines, and tracking resolution status, ensuring accountability.
  • Version Control and Audit Trails: Meticulous tracking of all model versions and changes, along with comprehensive audit trails of who made what changes and when. This ensures data integrity and traceability throughout the project lifecycle.
  • Workflow Automation: Tools to automate routine coordination tasks such as RFI (Request for Information) processes, submittal reviews, and clash reporting, streamlining the coordination cycle.
  • Open Standards Support: Compatibility with open BIM formats like IFC (Industry Foundation Classes), BCF (BIM Collaboration Format) and IDS (Information Delivery Specifications). This is critical for interoperability between different software applications and promotes vendor neutrality.
  • Reporting and Analytics: The ability to generate detailed reports on clash statistics, issue resolution rates, and overall coordination progress, providing valuable insights for project stakeholders.
  • Mobile Accessibility: Ensuring that project information, including models and issue logs, is accessible from any device, crucial for site management and field teams to verify coordination efforts on-site.
  • Integrations: Seamless compatibility with BIM authoring tools (e.g., Revit, ArchiCAD, Tekla Structures) and other construction project document management software to create a connected ecosystem.

The Benefits of Embracing BIM Coordination Software

Implementing BIM coordination software yields significant benefits, particularly for project quality and efficiency:

  • Reduced Rework and Cost Overruns: By identifying and resolving clashes digitally before construction, teams avoid costly on-site conflicts, material waste, and schedule delays. This directly impacts the project’s bottom line.
  • Improved Design Quality: Early coordination ensures designs are constructible and functional, leading to a higher quality final product and fewer post-construction issues.
  • Enhanced Communication and Collaboration: The platform serves as a central hub for all coordination-related discussions, fostering a more transparent and responsive environment among all disciplines involved in BIM collaboration.
  • Accelerated Project Schedules: Efficient clash resolution and streamlined workflows contribute to faster decision-making and a more predictable construction timeline.
  • Better Risk Management: Proactive identification of potential issues reduces project risks, leading to safer construction practices and more secure project outcomes.
  • Increased Data Accuracy and Reliability: The CDE concept ensures that all project participants are working with the most up-to-date and accurate model information, leading to higher quality deliverables.
  • Greater Accountability: With clear assignment of issues, tracking of resolution progress, and documented communication, individual and team accountability for coordination efforts is significantly improved.

Criteria for Choosing BIM Coordination Software

When evaluating BIM coordination software solutions, consider the following criteria:

CriteriaDescription
Open Standards SupportCompatibility with open BIM formats (e.g., IFC, BCF, IDS) is critical for interoperability.
Automated Clash DetectionRobust and customizable clash detection capabilities with intelligent reporting.
Integrated Issue TrackingComprehensive system for creating, assigning, tracking, and resolving coordination issues.
Real-time SynchronizationEnables live updates and true collaboration on models and issues.
ScalabilityShould support large, complex projects with many stakeholders and extensive model data.
Ease of UseIntuitive interface for various users, from BIM specialists to project managers.
Mobile AccessEssential for on-site validation and issue reporting from the field for site management.
Customizable WorkflowsAbility to tailor coordination processes to your project’s specific methodology.
Cloud Hosting & SecurityEnsure compliance with data privacy and security standards for your project data.
Collaboration AnalyticsInsight into coordination performance, issue resolution rates, and team efficiency.

Catenda Hub, a cloud-based BIM coordination software, was built to support open standards and empower every stakeholder in the construction lifecycle. Unlike legacy tools, Catenda Hub provides:

  • Full BIM collaboration capabilities with a focus on open formats.
  • A modern UI with no need for plugins, simplifying access and use.
  • Robust support for site management features, bridging the gap between design and construction.
  • Real-time issue tracking and advanced model viewing for efficient coordination.
  • Built-in construction document management alongside model coordination.

Catenda Hub helps project teams work more transparently and efficiently—whether you’re coordinating design changes, managing RFIs, or tracking site progress. By centralizing models and issues in a Common Data Environment, it ensures clarity, control, and confidence from design through delivery, making it an indispensable tool for proactive BIM Managers.